Comment: The Lafayette Connector project has failed to meet federal requirements for public involvement and environmental justice

 



From:
Mike Waldon 
Mon, Nov 15, 2021 at 3:56 PM
To: comment@lafayetteconnector.com
Cc: Josh Guillory, Charles Bolinger, Shawn Wilson, Monique Boulet, Tim Nickel, Col. Greg Ellison, Andy Naquin, Glenn Lazard, Liz Hebert, Nanette Cook, Patrick Lewis, Abraham Rubin Jr., Bryan Tabor, John J. Guilbeau, Joshua Carlson, Kevin Naquin

DOTD I-49 Open House

Subject: Comment for November 4, 2021 event transcript - Failure to address contamination and environmental justice

This is my public comment following the event that was called a "public meeting" held on November 4, 2021. I ask that my comment be included in its entirety in the public meeting transcript and the record of Lafayette I-49 Connector project comments.

It is misleading for the meeting transcript to call this a public meeting.  As with your previous meetings, the public was given no opportunity to openly provide comments or feedback. Simply providing an email address and comment cards is not adequate. This event would more accurately be called a poster session. 

This and other meetings held by the Lafayette Connector project fails to meet state open meeting law requirements (see my comment submitted October 19, 2017), and federal requirements for public involvement (https://www.fhwa.dot.gov/planning/public_involvement/orders/#a9).In the future, I urge the Lafayette Connector management team to follow not only the statutory and regulatory requirements for public involvement, but to also sincerely follow the spirit of open involvement on which these requirements were based.

This proposed state/federal urban interstate project completely ignores the issues of social justice, environmental justice, risk of severe health impacts on the predominantly disadvantaged community, and damage to property caused by spreading of toxic contaminants. This is in clear violation of federal requirements for public involvement. This project is in violation of Executive Order 12898, and the federal FHWA's published public involvement requirement to "assure that possible adverse economic, social, and environmental effects relating to any proposed project on any Federal-aid system have been fully considered."

Specifically, a large part of the proposed corridor of this project is heavily contaminated or likely to have contamination of soil and groundwater. This fact has been established in past court proceedings. However, the full spatial extent of contamination has never been publicly disclosed, and is likely unknown. Data and reports in possession of the Louisiana DOTD have been declared confidential by DOTD leaving the public ignorant of potential health risks that DOTD already knows about, or should know about after more than 30 years of floundering through design after design of this anachronistic project while avoiding knowledge of the risk and cost. 

Long ago when I was studying to be an environmental engineer, I recall learning that the first thing to do when considering working with a contaminated site is to determine the spatial extent of the contamination. After decades, the Connector project planners either have not made the determination of spatial toxic extent in the project corridor, or are not disclosing it to the at-risk public. In either case, this failure clearly violates federal policy including environmental justice requirements

We, the public, do have enough information about toxic contamination in the project corridor to know that it is an extremely serious risk. Indeed, neighbors of the railyard have sued seeking cleanup. We know that operating construction machinery over land contaminated with asbestos, arsenic, and lead risks spreading toxic dust through neighboring homes and businesses. If you want to give us poster sessions on your plans, show us how you will work in this toxic environment without further exposing us to toxic and carcinogenic chemicals through air, surface water, groundwater, and drinking water.

Likely, for over a century, contaminants have been eroded and followed drainage along Evangeline Throughway contaminating much of the surface soil in the corridor. Other contaminants have surely moved through the surficial aquifer under surrounding homes and businesses. It is known that the contaminants from the railyard migrated through groundwater off-site because Lafayette city/parish workers found and reported visible contamination off site near the railyard. 

We do not know the extent of migration of the contaminants from the contaminated railyard and other contaminated sites along the proposed route. However, we do know that in Houston a similar railyard has had significant off-property migration. Further, the State of Texas has confirmed that this contamination is coincident with cancer clusters in neighboring communities. 

The impact of the Lafayette Connector project on air and water toxic migration is vitally important to our community. The impact of toxic migration on design and construction of the Connector is vitally important to taxpayers who are paying for this project. A cleanup plan must be proposed for this project and must be disclosed to the at-risk public for public review and comment. This is not only a regulatory requirement, it is a moral and ethical requirement for those promoting this project. 

Finally, I address the engineers working on this project. How can you propose a project while remaining willfully ignorant of environmental consequences of your proposed actions on the surrounding community and construction workers? Every engineer  is ethically required to give protection of human life and property the highest priority. Doesn't the sequencing and planning of the I-49 Lafayette Connector project to-date breach your professional engineering ethical boundaries?

I am submitting these comments via email to comment@lafayetteconnector.com. I am also copying some interested members of the community, members of the I-49 Connector Executive Committee, and our City and Parish Council members. I will also send these comments in a separate message to US Secretary of Transportation Pete Buttigieg.

Thank you for considering my comments.

Michael G. Waldon, Ph.D.
110 Seville Blvd 
Lafayette, LA 70503 
337-852-3668, email: mike@mwaldon.com
November 15, 2021

Friday, March 15, 2019

February 2019 LRX Public Meeting Comments

The comments below were submitted on March 15, 2019. The February public meeting that solicited these comments presented the Tier 1 Environmental Impact Study for the Lafayette western bypass termed the Lafayette Regional Xpressway or simply the LRX. Learn more about the meeting and the LRX by reading the recent Connector Comments meeting announcement. It is available by clicking HERE.

The period for public comments closes on March 18, so you may still have time to submit your statement of support, concerns, or questions. Although the attached comment is quite detailed, short comments simply stating support and/or concerns are of great value and provide evidence of public interest.

The meeting slide show included this information on how to provide written comments after the meeting:
  • Send comments to: HNTB Corporation,10000 Perkins Rowe, Suite 604, Baton Rouge LA 70810,
  • or, Email comments to kbprejean@hntb.com
  • Comments received or postmarked by March 18, 2019 will become a part of the record.

If you have submitted or do submit comments through one of these methods, please consider sharing your comments with us by pasting then in the comments section at the end of this article. However, do be aware that comments on this Connector Comments site are not official, so be sure to submit official comments as described in the bullets above.


__________________________________________________________

Comments of Michael G. Waldon, PhD
Following LRX Public Meeting February 28, 2019


The following comments are my comments submitted in response to the request for public comments at the Public Hearing held in Lafayette on February 28, 2019.
I have divided my comments into the following topic-related sections.

Statement of appreciation
Relationship to other projects and needed model scenarios
Where is the Eastern Corridor?
Arkansas example - phased funding and completion
Flooding
Preferred corridor selection
Public information and participation
Public support
2005 Study Corridor Map


Statement of appreciation

I first sincerely thank the LMEC for holding this hearing and giving the public an opportunity to share our support and concerns. Thanks is also due to the visionary citizens of Lafayette who saw almost two decades ago that the only viable path forward for a north-south interstate connecting I-49 segments was a bypass. At that time, the so-called I-49 Connector, the “Con,” was seen to be effectively dead; killed by fierce public opposition, environmental infeasibility, and legal challenges. And rightfully so.


Relationship to other projects and needed model scenarios

If we cannot call the LRX an alternative to the I-49 Con, then at least allow us to call it a substitute.

Although our Louisiana DOTD continues to waste many tens of millions of federal tax dollars on planning the I-49 Con, it is even less viable today than in the early 2000s when it was effectively abandoned. Today’s advancements in geochemical science provide an even better understanding of the environmental risk of further contamination of the Chicot aquifer, and there is a renewed concern for flooding since the 2016 regional flood disaster. Additionally, the massive negative impact of urban interstates, particularly on poor and minority communities has become even more apparent than it was  decades ago. The Con is today quite simply inviable (i.e. dead). For years the LRX plans were stalled in order to not “distract” the public with the promise of a substitute for the locally opposed Con. Let us delay no longer. The LRX is our most advanced proposed substitute for the failed Con, and I urge our professional, political, and civic leaders to now give its development their enthusiastic support. Lafayette does urgently need the LRX project. Although completion of the LRX may be far in the future, every distraction coming from the Con, and every other delay simply moves LRX completion further into that future.

If ever built, the I-49 Con is almost certain to be partially toll funded (https://connectorcomments.blogspot.com/2016/06/the-specter-of-tolls-on-i-49-connector.html). Former Secretary of Transportation Dr. Kam Movassaghi was quoted (The Independent, April 14, 2009) saying that tolls must be considered for funding I-49 construction. An expert speaking to a meeting sponsored by our Chamber of Commerce affiliate One Acadiana (The Advocate, October 22, 2015) suggested that a toll of $0.19 per mile might be used to fund I-49 completion, and an Advocate article (September 22, 2014) reported that a state funded feasibility study looked at $0.18 per mile for I-49 funding. Former State Senator and then I-49 South Coalition Director, Mike Michot, was quoted in that same article saying about I-49 South "It seems unlikely a project of that magnitude will be built without the help of toll dollars."

The infeasibility of building the I-49 Con project is highly relevant in planning for the LRX, as is the prospect of the Con also having tolls. Additional model scenarios need to be considered for LRX planning. First, the scenario that the I-49 Con will never be constructed needs to be considered as a scenario because this is in fact most likely. Second, the scenario that the I-49 Con is built but has tolls must be considered. Adding tolls to the I-49 Con in modeling will increase traffic flow and toll revenue of the LRX. Failure to include these added scenarios related to the future I-49 Con seriously impairs planning for LRX traffic and toll revenue. Failure to consider these scenarios could negatively impact Louisiana's financial negotiations in dealing with the private PPP project partner for the LRX. 

It seems relevant to mention here that despite the tens of millions of dollars already spent on I-49 Con planning, to-date the DOTD has refused to include an I-49  toll scenario, or to incorporate the LRX in any I-49 Con traffic models. To members of the public this appears to be a blatant attempt to inflate traffic projection to thus justify the Con project. This concern is relevant here because I hope that such manipulation of planning results is not a part of the LRX project. A refusal to run the added scenarios listed here would lead to a similar but opposite appearance. It would lead the public to think that the LMEC and DOTD are purposefully failing to consider scenarios in order to “put their finger on the scale” giving preference to the Con relative to the LRX substitute.

In summary of my concerns stated in this section, I am asking that two LRX planning scenarios (model runs) be added for projection of traffic and toll revenue. First, projections are needed for the most likely future in which the I-49 Con project is abandoned and never built. Second, The scenario that the I-49 Con is constructed as a toll funded project is additionally required. Planning for the LRX that does not consider these possible futures would have little credibility in the eyes of the public. 

Where is the Eastern Corridor?

Earlier LMEC documents map an eastern corridor extending from I-49 north of Carencro to I-10 west of Breaux Bridge. Documents include “TECHNICAL MEMORANDUM 4: ENVIRONMENTAL RECONNAISSANCE” dated February 2005, “LAFAYETTE METROPOLITAN EXPRESSWAY FEASIBILITY STUDY EXECUTIVE SUMMARY IMPLEMENTATION PLAN”  dated June 2005. Figure 4-1, “Study Corridor Map,” from the 2005 Technical Memorandum 4 is appended to the end of these comments for the reader’s convenience. I have seen no published planning or engineering study, or any rationale for dropping the eastern segment. Was a decision made to drop this option? Does any documentation of the decision exist and was the public invited to comment on the decision?

For many years local citizens have supported an eastern route bypassing Lafayette following the high ground of the Teche Ridge. Here are a few of the links demonstrating this long-term support information on this proposed roadway:
     Kelly Roberts Caldwell spokesperson comments for Lafayette citizen groups in the I-49 Connector FEIS, Volume II, page 299  dated April 30, 2001 https://connectorcomments.blogspot.com/2017/04/public-comment-from-16-years-ago.html
     Connector Comments blog, May 27, 2016, “The I-49 Lafayette Bypass Option: Teche Ridge” https://connectorcomments.blogspot.com/2016/05/the-i-49-lafayette-bypass-option-teche.html
     I-49 Teche Ridge Bypass Facebook page https://www.facebook.com/I-49-Teche-Ridge-Bypass-191859984503529/
     Harold Schoeffler’s presentation to the St. Martin Parish Council on February 16, 2016 https://soundcloud.com/mike-waldon-906517104/hschoeffler-stmartinparish-2016-02-16

Some have suggested that such a roadway might begin as a two lane expressway and expand where needed to four lanes. Combined tith the LRX, the Teche Ridge eastern bypass would provide Lafayette with a full loop. This would improve traffic, efficiency of travel, and attract desirable economic development to communities in both Lafayette and St. Martin Parishes.

This comment is directly relevant to the LRX plan because it appears that the proposed eastern corridor was aligned to connect with the eastern Teche Ridge bypass which has been so long supported by citizens here. While I understand that the LMEC desires, as far as possible, to keep roadway development within Lafayette Parish, it seems arbitrary and wasteful to drop the eastern corridor from all consideration. I ask that future planning include this eastern corridor as a potential future extension. 

Arkansas example - phased funding and completion

The Bella Vista Bypass (Arkansas Hwy 549) is being constructed in Arkansas as a part of their I-49 completion. I believe this is a good example of a state (Arkansas) listening to public concerns and developing a bypass rather than running the interstate through the heart of a community. The Bella Vista bypass has been designed and is being and constructed by ARDOT. It is being constructed one segment at a time as funding becomes available. While in Lafayette we are mired in I-49 planning that will likely never lead construction, Arkansas is building a highway. The Bella Vista Bypass is initially being constructed as a two-lane expressway which will be expanded to four lanes as funding permits. Arkansas has been able to design a viable project which will likely be completed long before we even begin construction. I urge the LMEC and Louisiana DOTD to consider using a similar incremental approach for the LRX. You can learn more about the Bella Vista Bypass from the Wikipedia article titled “Arkansas Highway 549,” by Googling news articles, and by downloading ARDOT project documents.

Flooding

In an urban setting such as the I-49 Con, finding hundreds of acres outside the flood zone for runoff retention is at-best expensive and at-worst impossible. However, in the rural setting of the LRX this is less of a problem and may actually be viewed as a project benefit. I urge the LMEC to make flood impacts from the LRX project an integrated part of planning. In other projects the Louisiana DOTD has been accused of failing to adequately consider flood impacts of their projects. My understanding is that, as a state agency, DOTD is not required to follow local ordinances requiring runoff retention or other flood impact analyses or mitigations. In spite of this I ask that the LMEC pledge to integrate runoff management planning into every level of LRX design including the plan development for roadway routing. In the rural setting of much of the LRX, retention ponds can actually be an aesthetic feature while possibly providing needed fill for roadway elevation. Landowners may also welcome retention ponds as neighboring features which improve property values and provide alternative drainage for development.  

Preferred corridor selection

I agree with the selection of the preferred corridor identified in the meeting handout. Not only does this selection best meet the criteria in the selection matrix, It is the alternative which may most quickly be constructed.

Public information and participation

At the public hearing I voiced my concern that the LRX web site (www.lrxpressway.com), was not being maintained, and information on the site appeared to be years out-of-date. I also noted that information from the 2017 public hearing had not been posted to the site as had been promised to me at that meeting. Following the 2017 meeting, I did try on multiple occasions to contact anyone from the LMEC about this, but was unable to do so using the outdated information then available on the web site. If I had expended more effort I could have likely made contact, but such a level of effort should not be required for a member of the public to simply get information.

I have additionally tried to find the schedule for the quarterly LMEC meetings, meeting agendas, and meeting minutes. As a public body in Louisiana, there are requirements that these be available on the web site. However, such information was not on the LRX web site. Following the February public meeting, I was told that some of this information is actually on the LEDA web site. However, I have not found this information on either the LEDA web site or the LRX site. The LRX website has an LMEC meeting page which is reached from a link on the “about LMEC” page:  www.lrxpressway.com/lmec-meetings/
However this page refers to the schedule of the 2011 meetings, and even that information is incomplete.

Please post on the LRX website all documents required by law and publish timely announcements of the quarterly LMEC meetings. At a minimum LMEC must meet the requirements of the Louisiana open meeting law, but I hope LMEC will exceed these requirements by actively seeking public involvement.

Since the February 2019 meeting, I do see that LRX public meeting materials have been added to the LRX web site for 2019, and prior public meetings including the 2017 public meeting. These posted documents have been useful and I thank the LMEC for providing them. However, I am unable to locate agendas, calendars, or minutes for the legally required quarterly meetings of the LMEC. I request that these either be provided on the LRX site, or that a link be placed on the LRX web site to wherever these documents are archived. I also ask that LMEC meeting announcements be prominently posted on the LRX website along with the agendas for upcoming meetings so that the public and media may attend.

Public support

There was a clear demonstration of the public’s interest in the LRX project shown by the standing-room only crowd at the February public hearing. Although I did hear mild concern from a few potentially impacted property owners, I did not hear a single person comment that they were opposed to this project. This stands in stark contrast to the near unanimous public opposition concerning the I-49 Con voiced at every public meeting held over more than two decades by DOTD and others. The public is not timid in voicing opposition, and I felt that the lack of any expression of opposition toward the LRX, as well as the many positive voices of strong support, together give an indication that the LRX project can be successful. The LRX can be a valuable addition to our region’s transportation infrastructure. I support its development. Thank you again for this opportunity to comment. 


2005 Study Corridor Map



February 2005 “Study Corridor Map” from Figure 4-1 in the report “Lafayette Metropolitan Expressway, Technical Memorandum 4, Environmental Reconnaissance.” The black circle was added to the figure to indicate the segment termed the eastern corridor in these comments.




Michael G. Waldon, PhD
Resident of Lafayette Parish, Louisiana

March 15, 2019

Tuesday, October 23, 2018

The I-49 Boondoggles

What is a BOONDOGGLE? Wikipedia tells us it refers to
projects involving large numbers of people and usually heavy expenditure, where at some point, the key operators, having realized that the project will never work, are still reluctant to bring this to the attention of their superiors.  
Public opposition to routing I-49 through the heart of our city goes back at least to 1992, and for years now, Lafayette residents have recognized that the government project now being called the Lafayette I-49 Connector (we call it the I-49 Con) is a prime example of a wasteful government boondoggle (for an example of public comment read "Why the I-49 connector won't work" published May 27, 2016 in the Daily Advertiser). The public has been assured many times that if there is significant public opposition to the project it will never be built. Yet, the I-49 Con continues spending tens of millions of tax dollars on studies and design that will never be used for a footprint through the heart of the Lafayette.

Sarah Palin holding Nowhere Alaska t-shirt
Sarah Palin holding a T-shirt related to the Gravina Island Bridge.
Credit: Bob Weinstein via Wikimedia
Regardless of how wasteful the project, politicians from both sides of the aisle often find it hard to oppose tax funded boondoggles. Perhaps this is because of the inevitable cycling back of a percentage of the money into campaign contributions. Even some of the most conservative politicians seem unable to pass up wasteful government boondoggle projects. Do you recall the support of Sarah Palin for federal funding of the Gravina Island Bridge commonly referred to as the iconic "Bridge to Nowhere?"


The national Public Interest Research Group (USPIRG) published their 2018 list of US interstate highway boondoggle projects. If built as proposed, these boondoggles would waste tens of billions of our federal transportation tax dollars. And, even if these boondoggles are never built, billions will be spent on their planning and design before public pressure and simple rationality end their useless authorizations.

Although our own local boondoggle, the I-49 Con, did not make the USPIRG list this year, its sister project in Shreveport, the Shreveport I-49 Inner City Connection did make 2018's national list of worst boondoggles. Better luck next year to our own I-49 Con! If USPIRG accepts nominations in 2019 the I-49 Con will have my vote.

It is important that our political representatives hear from their voters about stopping these federal transportation boondoggles. If we don't speak up the only voices our leaders hear come from paid lobbyists representing the corporations and contractors who are hoping to continue getting design and construction contracts.

We do know that at least some of our leaders are hearing us. On October 17, 2018, One Acadiana hosted a 3rd Congressional District Candidate Forum. All seven remaining congressional candidates running in the November 6 general election participated in the forum:


Several of the candidates spoke to the forum in general terms about our need for improved infrastructure and the need to eliminate wasteful federal spending. However, two candidates spoke directly about problems with routing I-49 through the center of Lafayette. Congressman Clay Higgins noted that routing the interstate footprint through the central city would displace or impact a large number of private property owners. He concluded that an actual footprint for the project still needs to be selected. Candidate Mimi Methvin cited further problems with the central city route including its planned passage through the highly contaminated former railyard site. Furthermore, she noted that today urban experts and planners recognize urban blight in many US cities has been caused by the past construction of inner-city interstates.

Do you agree that the Lafayette I-49 Con is one more federal boondoggle currently wasting many tens of millions of tax dollars on design of a route through the heart of our city? Do you agree that, as now planned, the I-49 Con should never and likely will never be built?

If your answer is yes, I urge you to contact your chosen 3rd district candidate. Tell him/her of your opposition to the currently proposed central I-49 route. Ask your candidate to support planning for one of the much less costly and less damaging alternatives bypassing Lafayette to the east along the Teche Ridge or west following the plan for the Lafayette Regional eXpressway (LRX). In addition to saving federal and state taxes, either alternative also involves much lower cost to our local governments, reduces risks to property and health, and eliminates most impacts to flooding and traffic congestion inherent in the I-49 Con planned route through the heart our city.

Mike Waldon, PhD
October 23, 2018 

Thursday, June 29, 2017

LFT Airport Update


(Why is there a $200 million problem looming at LFT? Be sure to read to the end to find out.)

A presentation on the current status of the Lafayette Airport (LFT) and planned airport renovations was an agenda item for the June 20, 2017 Lafayette City/Parish Council meeting. Presenters were Valerie Garrett, Chairwoman of the Lafayette Airport Commission, and Steven Picou, LFT Executive Director. Paul Guilbeau, Vice-Chairman of the Lafayette Airport Commission was also in attendance. Their summary update document provided by the Council Clerk is available here.



View the 12 minute video of the airport update by clicking here or view it in the frame at the bottom of this post.

STEVEN L. PICOU
LFT Executive Director

Steven Picou's update summarized these points:

  • LFT has hired their Program Management/Construction Management (PMCM) firm
  • 5000 citizens gave public input that contributed to the selection of the Journey renovation design
  • The Disadvantaged Business Enterprise (DBE)program at LFT is a priority
  • Part 139 inspection had zero discrepancies
  • LFT is prepared for tropical storms and hurricanes
  • Past year's cargo handling of 24.6 million pounds is up from the prior year 
  • The cargo handling facility is opening, UPS and Fed-X are moving in

The I-49 Connector plan requires moving a runway at LFT -

Dr. Michael Waldon asked during public comment if the runway displacement required by the I-49 Connector project would result in any changes to the renovations. He also cited his minimum safety requirement calculation that shows that the displacement would need to be 860 feet rather than the 350 feet stated in the I-49 FEIS. This calculation was published last year in the ConnectorComments.org post titled Airport angles and increased risk. Mr. Picou replied that he had not seen the published recalculation of the displacement. Further, he said that new FAA regulations would require an additional 1000 feet of runway if it is reconstructed. Mr. Picou stated that the airport "has hired a firm to look at that information." Currently the airport is constructing an EMAS system (engineered materials arrestor system) at the end of this runway. He also said that Dr. Kam Movassaghi had led a student design project that might eliminate or reduce the required displacement, but DOTD has not reported any study of such options.

District 9 Councilman Theriot asked whose responsibility would it be if the runway had to be displaced. Mr. Picou answered that FAA has taken the stance that it is not their responsibility, and it is not the airport's responsibility. He went on to say that in his opinion "It is Federal Highways responsibility." FAA takes the stance, he said, that millions of their dollars have already been spent on the airport, and it is not their responsibility.

The bombshell of the evening occurred when Councilman Theriot followed up by asking what the cost would be. Mr. Picou replied that a rough order-of-magnitude estimate is $200 million dollars. In part, this cost is so high because the FAA would no longer allow the use of an EMAS at this end of the runway, which results in an added runway length requirement of 1000 feet.

While there may be intergovernmental discussion of which tax dollars will fund this $200 million (or more), in the every case it is taxpayers who will pay and citizens who will suffer added flooding from the loss of flood storage currently provided to Lafayette and St. Martin Parish residents by the Cypress Island Swamp.